OFFICE TIMING: 10.00 AM TO 5.00 PM (MON TO SAT)
SARB
-ITI with minimum 5 to 10 years experience in repair and maintenance of Sewage Water Treatment Plant (STP) aside form R/O (Reverse Osmosis) Plant in Power Plant Construction Projects.
-Install, repair and maintenance of the r/o plant.
-Operate and maintain the r/o plant to produce optimum quality, potable water
-Maintain and operate the filtering and chemical treatment process.
-Inspect, service and repair components of the water treatment plant including water intakes, pipes, water storage vessels, chemical treatment equipment controls, circulation pumps, boilers, heat exchangers and valves.
-ensure an adequate supply of water is always available for human consumption and fire fighting activities.
-Prepare work orders for servicing and repairs.
-Daily inspection of the plant systems to ensure effective operations.
-Establish preventive maintenance schedule.