DOWNLOAD SHANK APP ON YOUR ANDROID SMART PHONES FOR JOB NOTIFICATIONS.
OFFICE TIMING: 10.00 AM TO 5.00 PM (MON TO SAT)
The banksman is in charge of the crane movements from the point of loading and unloading. They may use a system of hand signals or a radio link.A banksman may also be responsible for directing the movement and loading/unloading of lorries, or directing the movement of other plant. A banksman may also control the movements of an excavator, by carefully monitoring the bucket for any obstructions or underground services.