OFFICE TIMING: 10.00 AM TO 5.00 PM (MON TO SAT)
Key Accountabilities
-Ability to read and interpret HVAC duct layout drawings
-Tag the HVAC ducting drawings for duct fabrication.
-Fabrication of sheet metal air-conditioning ductworks (cutting, marking, assembly and plenums)
-Identify the correct tools required for the execution of works
-Fixing of thermal and acoustic insulation.
-Take quantity take off of ducting, accessories like VCD, FD, AD, and SAD.
-Ensure proper use of tools and tackles including its maintenance to ensure uninterrupted availability of resources to accomplish task at hand. Eliminate material waste by diligent planning and use of material at site
-Keep records of assignments and produce detailed work reports
-Maintain highest level of discipline among assigned workforce and ensure strict adherence to site work timings.
-Strictly adhere to the HSE policies and procedures of AF Engineering to achieve the company’s goal of “NO Lost Time Injury”
Job Specification / Know-how
Education:
ITI in Ducting or Equivalent education
Experience:
Minimum 3 to 5 of relevant experience
Technical Skills:
-Minimum 3-5 years of Industry experience in Gulf.
-Must have Good in English.
-Communication skills
-Perseverance and hardworking nature
-Stress-Management skills
-Problem-Solving skills